Bathroom Remodeling in Shreveport

How To Plan A Bathroom Remodel in Shreveport: Timeline, What To Expect & Design Tips

How To Plan A Bathroom Remodel in Shreveport: Timeline, What To Expect, & Design Tips

A bathroom remodel is one of the most valuable home upgrades you can make, but it can also be one of the most overwhelming to plan. Between design choices, budgeting, and the logistics of demolition and installation, it’s easy to feel like you’re in over your head. That’s why careful planning is key, especially in a market like Shreveport, Louisiana, where local trends, weather, and home values all play a role in your remodeling decisions.

In this guide, we’ll walk you through the realistic timeline, average costs, and smart design tips for planning a bathroom renovation,  along with insights from our experienced remodeling team here at Lockwood Roofing & Remodeling.

Why A Bathroom Remodel Is A Smart Investment

A well-executed bathroom renovation can yield a high return on investment (ROI), especially when you upgrade essential elements like showers, vanities, and lighting. According to the 2023 Cost vs. Value Report, a midrange bathroom remodel in the South has an average ROI of 60–70%, depending on the materials and layout changes.

In Shreveport specifically, buyers are looking for updated bathrooms with walk-in showers, modern lighting, double vanities, and clean finishes. Even if you’re not planning to sell anytime soon, remodeling your bathroom adds comfort and functionality to one of the most-used rooms in your home.

The Planning Timeline: What To Expect

Depending on the size and scope of your project, a full bathroom remodel typically takes 4 to 8 weeks from start to finish. That’s after the planning phase is complete. Here’s a basic breakdown of the timeline:

Week 1–2: Design & Planning

You’ll meet with a contractor to define your vision, set your budget, and choose materials. This is where layout decisions are made and lead times for fixtures and tile are factored in.

Week 3–4: Permits & Product Ordering

If plumbing or electrical work is involved (which it often is), permits may be required. During this phase, all materials,  from tile and flooring to vanities and tubs,  are ordered to avoid mid-project delays.

Week 5–8: Demo & Construction

Demo begins, followed by rough-in plumbing and electrical work. Once inspections pass, walls go up, tile is installed, and fixtures are added. Final touches include painting, sealing, and any punch list corrections.

⏱️ Pro Tip: Supply chain issues can impact lead times, especially on custom vanities or stone countertops. Order early and stay flexible.

What’s Included In A Full Bathroom Remodel

Many homeowners underestimate the number of layers involved in a bathroom renovation. A full remodel goes far beyond new paint or replacing a faucet. Here’s what’s typically included in a comprehensive remodel:

  • Demolition of existing fixtures, flooring, walls, or tile

  • Plumbing rerouting (if changing the layout or adding new features)

  • Electrical updates for new lighting, fans, or GFCI outlets

  • New flooring — tile, luxury vinyl, or waterproof laminate

  • Shower/tub upgrades — often walk-in showers with frameless glass doors

  • Vanity installation with sinks, faucets, and built-in storage

  • New lighting fixtures — both overhead and task lighting

  • Paint and wall finishes — moisture-resistant options are key

  • Hardware and accessories — towel bars, mirrors, toilet paper holders

At Lockwood, we walk our clients through every step — helping with material selection, layout optimization, and design planning that fits your goals and budget.

Design Trends that Buyers (and Homeowners) Love

Today’s bathroom trends blend style, comfort, and low-maintenance functionality. Whether you’re remodeling to sell or stay, consider incorporating features like:

  • Walk-in showers with bench seating and niche storage

  • Floating vanities or double sinks for shared spaces

  • Matte black or brushed gold fixtures for a modern finish

  • Large format tile for a seamless, spa-like look

  • LED mirror lighting and dimmable sconces

  • Heated flooring for comfort in winter months

Design decisions should always balance personal taste and resale value, and our team can help you navigate which features will give you the best long-term return.

Common Mistakes To Avoid During A Remodel

Bathroom remodels can go sideways fast if you’re not prepared. Based on our years of remodeling experience in Shreveport, here are a few pitfalls to watch out for:

  • Underestimating your budget and skipping a contingency fund

  • Choosing cheap materials that don’t hold up to moisture

  • Failing to plan for ventilation, especially with hot, humid Louisiana summers

  • Starting without finalized design decisions — delays = added cost

  • Not vetting your contractor — always hire licensed, insured pros

Local Expertise Matters

Working with a Shreveport-based remodeling contractor offers major advantages. We understand local permitting processes, soil conditions (which affect plumbing), and architectural styles common in the region. At Lockwood Roofing & Remodeling, we’ve worked on homes across Stonewall, Shreveport, and surrounding areas — and we take pride in bringing both quality and accountability to every project.

A bathroom remodel is more than a design upgrade — it’s an investment in your home’s value, efficiency, and comfort. Whether you’re dreaming of a luxury retreat or just need to modernize an outdated space, smart planning and local insight are key to a successful project.

Have questions about where to start? Contact Lockwood Roofing & Remodeling for a consultation — we’ll help you create a bathroom that’s both beautiful and built to last.

FAQs: Planning a Bathroom Remodel in Shreveport

1. What’s the best time of year to remodel a bathroom in Louisiana?

Fall and winter are often ideal, as contractor availability increases and weather delays are minimal compared to hurricane season. However, interior remodels can be done year-round if properly planned.

2. Should I upgrade to a walk-in shower if I plan to age in place?

Yes. Walk-in showers with grab bars, benches, and no thresholds are highly recommended for aging-in-place upgrades. They also appeal to resale buyers and improve accessibility without sacrificing style.

3. How can I remodel a bathroom without changing the layout?

Focus on cosmetic upgrades: new tile, vanities, paint, mirrors, lighting, and fixtures. Keeping plumbing in place can save 20–30% of your overall budget while still dramatically updating the space.

4. How do I know if mold or water damage is hiding behind walls?

During demolition, signs of mold or rot may become visible, especially behind old tile or near shower pans. Your contractor should check with a moisture meter and address damage before rebuilding.

5. What’s a realistic contingency budget?

Plan to set aside 10–15% of your total remodel budget for unexpected costs — such as structural repairs, plumbing issues, or delivery delays. This helps keep your project on track without stress.